Campgrounds closed for the season on 11/1/26
The campgrounds will be closed as of November 1st.
2026 reservations start on Monday January 4th at 8am |
Site 12 has access to the north lagoon which has a navigable channel into the Flowage. You are able to anchor or tether a boat by your site. The fire pit and picnic table are located towards the back of the site. The picture below shows the trail leading from the picnic table down to the north lagoon. A private boat dock will be installed for 2026!
| Dimensions: |
18' Wide x 42' Deep |